Wois: World of Inspirational Speakers

Wois: World of Inspirational Speakers

AI platform for sharing and accessing authentic human insights.

2024-09-24 16:16:21

Community

Browse AI Tools Similar to "Wois: World of Inspirational Speakers"

BulkIMGFlow
BulkIMGFlow

BulkIMG Flow is a bulk AI image generator that turns prompt lists, CSVs, or Excel files into batches of images you can download together.

JotJam
JotJam

JotJam is a free browser app with a sketch pad, a floor plan tool and an online piano, guitar and drum kit. Its built-in AI helper, the fox, makes a first draft you can edit by hand: a simple sketch, a floor plan, or drums and chords for a riff you played.

RunDida
RunDida

Free running calculators, training tools, race predictions, and marathon information.

Wayground
Wayground

AI-powered teaching, assessment, and learning platform for K-12 educators

RoomSketcher
RoomSketcher

AI-powered platform for creating professional 2D and 3D floor plans

Zenzap
Zenzap

Collaborative AI agents that connect workplace tools and automate team workflows

Dreamwork
Dreamwork

AI job search platform that matches roles and tailors applications

OpenDesign
OpenDesign

Open-source design workspace for AI-assisted prototypes and collaborative creative work

Flashloop
Flashloop

An AI suite for generating and editing videos and images

Alta Daily
Alta Daily

AI stylist and digital closet for personalized outfits and wardrobe planning

Gleeday
Gleeday

Free AI invitations and event planning with RSVP tracking.

MausBot
MausBot

Open-source platform for managing AI bots, routines, and connected apps

Omnisend
Omnisend

Ecommerce marketing platform for email, SMS, automation, and web push

Larven
Larven

AI platform for creating, launching, and optimizing Meta and TikTok ads

Liquid AI
Liquid AI

Efficient AI models and deployment tools for devices, edge, and cloud

CorridorKey 2.0
CorridorKey 2.0

AI keying software for clean green and blue screen removal

TeachVerse
TeachVerse

IGCSE revision app where students learn by teaching an AI pupil.

Aarivi
Aarivi

AI platform for finding startup jobs and managing applications

TokenReply
TokenReply

A unified API gateway for accessing AI models from multiple providers

Upsun
Upsun

Cloud platform for applications and controlled AI-agent workflows

Free Text to 3D
Free Text to 3D

Generate and export 3D models from text prompts

magi2 ai
magi2 ai

AI video generator for creating sound-enabled videos from prompts and references

EaselPaw
EaselPaw

EaselPaw is an AI pet portrait studio that turns a photo of your pet into a painted portrait in about a minute. Choose from a range of classic and playful art styles, from royal and Renaissance portraits to oil painting and watercolor, and adjust each with its own options. The preview is free and needs no account, so you see the finished portrait before you pay anything. If you love it, download a high-resolution digital file or order it as an art print, canvas or framed piece, made to order and delivered to your door. Your photo is used only to make your portrait and is never used to train AI models.

NextBeing: AI Interview Assistant for Coding Interviews and System Design
NextBeing: AI Interview Assistant for Coding Interviews and System Design

For technical interviews: code checked for errors as it's written, live answers and AI mock interviews.

AI Transcription
AI Transcription

AI service for clean, formatted audio and video transcripts

MagiVideo
MagiVideo

An AI video and image generation platform with multiple models and creative tools.

Dessi AI
Dessi AI

AI platform for image generation, editing, and creative tools

Fayna
Fayna

Fayna is a job-search workspace: your career profile, résumés and cover letters for each vacancy and country, and every application tracked in one place.

BloxCanvas
BloxCanvas

AI generator for Roblox thumbnails, icons, GFX, logos, and profile pictures

MagicVio
MagicVio

Generate 1080p AI videos with synchronized audio from text and images.

ClipFlux
ClipFlux

ClipFlux is an AI tool that makes faceless YouTube videos from a one-sentence idea and can post them to your channel on a schedule.

Wink
Wink

AI tools for enhancing, restoring, retouching, and creating videos and images

Draftbit
Draftbit

Draftbit is an AI app builder where Claude Code or OpenAI Codex builds mobile apps, web apps, websites, games, and backends in real code, on the Claude or ChatGPT plan you already pay for.

Solor Stream
Solor Stream

Software for founders, with an AI consultant inside who checks your decisions against your own numbers.

Genjutsu AI Video
Genjutsu AI Video

Recast any video with your own characters, outfits or products while keeping the original motion.

Winly
Winly

A CRM for teams that sell in Instagram and Facebook DMs, with its own MCP server.

MAGI-2 AI Video Generator -app
MAGI-2 AI Video Generator -app

Online AI platform for generating videos with synchronized native audio.

Rake
Rake

Rake is the artificial firmware engineer, built to take your project from schematic to a running board.

Plot Party
Plot Party

Plot Party is an AI storytelling and video production workspace built for creators and studios making short dramas. Turn a script into a structured storyboard, keep characters and 3D scenes consistent across shots, and localize videos with 40+ language dubbing and lip-sync in one workspace.

Drma - AI Drama Generator
Drma - AI Drama Generator

AI tool for creating editable short dramas from story ideas

seedance 3.0
seedance 3.0

Create AI videos from text, images and reference files. Explore models for product clips, character animation and short stories.

Audio to text, in any language.
Audio to text, in any language.

Get a timestamped transcript in the original language, or translate your recording into English text and subtitles.

Frank AI Researcher
Frank AI Researcher

Frank AI Researcher runs AI-moderated voice interviews with your customers in 50+ languages and turns them into themes, quotes and insights.

Magi 2-si
Magi 2-si

Magi 2 AI video generator: create 4–30 second 1080p videos with native sound, lip sync and precise shot cuts from text, images or reference clips.

Wick
Wick

AI that reads a trading chart screenshot and returns the trend, key levels, both scenarios with probabilities and a trade plan.

SkinAI - AI Dermatologist In Your Pocket
SkinAI - AI Dermatologist In Your Pocket

AI skin scanner for rashes, moles, eczema, spots, psoriasis & 62+ conditions

Magi 2-im
Magi 2-im

Online AI studio for creating 4K videos with synchronized audio

MAGI-2 — 480B Native Audio-Video Generation Model On reAPI
MAGI-2 — 480B Native Audio-Video Generation Model On reAPI

Unified AI API platform with model information, playgrounds, and pay-as-you-go billing

MAGI2 AI Video
MAGI2 AI Video

Browser-based MAGI-2 video generation with synchronized audio

Magi AI
Magi AI

Generate and edit videos with synchronized audio using text and references.

Glasser
Glasser

Pay-as-you-go data APIs for AI agents, available through MCP, skills and the CLI.

個人運書(MyMingshu)
個人運書(MyMingshu)

個人運書根據出生資訊由程式排出八字與紫微命盤,再由AI分章撰寫個人化中文電子書。提供免費排盤和樣書,完整版可線上閱讀並下載PDF。

Demand Discovery
Demand Discovery

Startup Idea Validation powered by Real People, Real Market Signals. Evidence over optimism. Behavior over opinion.

Magi 2 AI Video Generator
Magi 2 AI Video Generator

Creates videos with sound from text prompts and reference images.

MAGI-2-com
MAGI-2-com

Multimodal AI video generation from prompts, images, clips, and audio.

Phase Router
Phase Router

One OpenAI-compatible API for about 370 AI models, with the price of every call in the answer and a signed receipt for each call.

DHTMLX Planning Engine
DHTMLX Planning Engine

Headless engine for resource-aware scheduling, leveling, and scenario planning.

MAGI 2-app
MAGI 2-app

Generate 1080p AI videos with sound from prompts, images, and references.

1MV AI
1MV AI

Turn one image and a full song into an AI music video in one click. Free to start.

GTO MAX AI
GTO MAX AI

Poker RTA with AI player profiling: real-time assistance that reads your online poker table in the browser and shows the GTO line plus an exploit line adjusted to the opponent, with the reasoning in words.

Magi-2 AI Video Generator
Magi-2 AI Video Generator

Generate 1080p AI videos with synchronized audio from prompts and references.

Magi 2 AI
Magi 2 AI

Independent Magi 2 guide and AI video generator with sound. Make text-to-video and image-to-video clips in your browser. Free credits, no watermark.

Lysting
Lysting

Property Reports for Florida Real Estate.

SteerCamp
SteerCamp

SteerCamp gives you a crew of AI members instead of one chatbot. Each member has a role, its own cloud computer and the apps you connect. They run on the Claude or Cursor subscription you already have, and ask before anything goes out.

Open Creati AI
Open Creati AI

Multi-model AI platform for creating videos, images, music, and creative marketing content

MangaPage-AI Manga Translator
MangaPage-AI Manga Translator

AI tool for translating manga and removing speech bubble text

3Dstudio.co AI Render
3Dstudio.co AI Render

3Dstudio.co AI Render turns a screenshot of your 3D model into a photoreal render that keeps your geometry. Free renders to start, no card.

AI voicer - org
AI voicer - org

Browser-based AI tools for speech generation, transcription, and voice editing

TextScore
TextScore

AI checker, text checker and writing tools for X, LinkedIn, Facebook and articles, in the browser or through an API for AI agents. Pay with Bitcoin, no card needed.

ThirdDraft
ThirdDraft

Finished SEO blog articles for your business: topics from real search demand, facts checked against sources, pictures included, published to your CMS.

Vocallab AI
Vocallab AI

AI voices that take direction: text to speech, voice cloning, audiobooks, podcasts and dubbing in one studio.

MAGI-2
MAGI-2

AI video creation and editing with directed visuals, dialogue, sound, and shot timing

Sondo
Sondo

AI platform for creating music and rhythm-matched music videos

Mocks
Mocks

Create and export 3D product mockups from your own designs.

Workato
Workato

Enterprise platform for app integration, workflow automation, and governed AI orchestration.

StudyTexter
StudyTexter

AI-assisted academic research and paper drafting with editable drafts and source citations.

Cheater Finder
Cheater Finder

Search public dating and social profiles for possible matches.

nixm
nixm

Cinematic AI video with its own sound, paid per clip. No subscription, no watermark. Private AI chat with no account to start and no transcript kept.

OpenEnvoy
OpenEnvoy

AI-powered platform for automating payables and other finance workflows.

EveryGen AI
EveryGen AI

Create AI videos from text or images. Compare Seedance, Veo and Hailuo, prepare your scene, and review the credit quote before generating.

Esek
Esek

An AI secretary that makes all the calls. Esek (esek.io) calls your customers back, reminds them and follows up, and answers your phone and messages, day and night.

Melodious AI
Melodious AI

Melodious AI turns a finished song into a music video. An AI director listens to your track, plans every shot with you in a chat, and shows you the storyboard and its price before anything is made. You get a video synced to your song, with lip sync on the sung lines and the same singer in every scene.

Tomako
Tomako

Tomako is an AI CMO for software founders and small teams. It finds growth opportunities in SEO, GEO, social and creator outreach, then does the work.

FLUX 3 - video
FLUX 3 - video

Browser-based AI video and image generation workspace

Face Rating AI - Free face report & attractiveness test
Face Rating AI - Free face report & attractiveness test

Browser-based facial proportion measurements and personalized face reports

PhotoMemorial AI
PhotoMemorial AI

Animate a deceased loved one's photo from one portrait, or turn two separate photos into an imagined hug. PhotoMemorial AI also creates memorial family photos. All generations require sign-in and paid credits. Videos are silent, run about five seconds, and require Family or Legacy on current plans.

RFTracks
RFTracks

RFTracks is a library of more than 15,000 AI-generated music tracks and sound effects for videos, podcasts, streams and games, free to use with a credit link and never claimed by Content ID.

Sales Agent OS
Sales Agent OS

An AI cold email sales team you set up in your own AI app.

gen.new
gen.new

An AI workspace for chat, image, video, audio, and 3D creation.

AWS Quick
AWS Quick

AI work assistant that connects apps, answers questions, and creates deliverables.